12th Jan 2011
Works on rehabilitation of clear-water reservoir in SUE "Vodokanal of St. Petersburg" (Russia). |
|
 |
|
25th Dec 2010
The project for rehabilitation of clear-water reservoir in Ufa (Russia) is successfully complete. |
|
 |
|
15th Dec 2010
Works on reconstruction of concrete tanks for sodium hypochlorite in Ivanovo (Russia). |
|
 |
|
5th Dec 2010
Works on rehabilitation of clear-water reservoir have started in SUE "Vodokanal of St. Petersburg" (Russia). |
|
 |
|
15th Oct 2010
Works on rehabilitation of clear-water reservoir have started in Ufa (Russia). |
|
 |
|
26th Aug 2010
The project for reconstruction of concrete tanks for sodium hypochlorite has started in Ivanovo (Russia). Each tank is 104 sq.m. and is used for potable water sterilization. |
|
 |
|
7th June 2010
The company took part in the International Water Forum ECWATECH-2010 in Moscow. |
|
 |
|
4th Apr 2010
Presentation of technology in petroleum processing plant "Kinef" (Russia) on the topic 'Introduction of innovative technologies in Oil Industry and Petroleum Refining'. |
|
 |
|
23d Dec 2009
Presentation of technology in Federal Highway Agency of Ministry of Transport of the Russian Federation. |
|
 |
|
27th Nov 2009
General Director of Linabond Rus took part in the work of the International Forum “Pure Water 2009” in Moscow.
|
2nd Nov 2009
The inspection of the main municipal sewer interceptor was performed in Naberezhnye Chelny. Reconstruction and protection of the interceptor were carried out in October 2008.
Inspection conclusions:
1. The Liner has no layer separation or peeling off from the surface of concrete and creates strong bond with the substrate.
2. The surface of the Liner (PVC sheet and Seam material) are visually not subject to failure.
3. No tearing of the liner or peeling of Seam material are found.
|
|
|
 |
22th Sep 2009
Repair works on the steel tank of RGD’s (Russian Railways Company) water tower in Tosno (Leningrad region) are finished. |
|
Water tower. Outside view  |
14th Aug 2009
The inspection of the test specimens (Linabond Co-Liners applied on concrete cubes) has been carried out by the specialists of the MSUE “Mosvodokanal”. The specimens were put to the verification tests in air-gas environment of a sewer tunnel since 29th of April 2009. The results of the inspection show that the test samples are in satisfactory condition, no damage or layer separation were revealed.
|
|
|
 |
30th Jul 2009
Hydrostatic pressure test of the joint was successfully conducted in a fiberglass pipe lined with Linabond SP Mastic System on the 23d of July 2009. The test sample could withstand the hydrostatic pressure of 11,5 atm.
|
|
|
 |
23d Jul 2009
Demonstration works on installing Linabond® Co-Lining systems in a fiberglass 1,40 meters diameter pipe were performed for the representatives of the SUE “Vodokanal of St. Petersburg” and its contractors.
|
|
|
 |
General Director of Linabond Rus V.Fomin (on the right) and Director for Production of the SUE “Vodokanal of St. Petersburg” B.A. Fedotov (in the middle)