Teleinspection of the sewer collector.
Pressure washing of the surface before applying the Lining System.
First work on corrosion removal from sewer's surface with sandblasting
Visual inspection of concrete corrosion of the upper part of the sewer
State of sewer's sides above daily flows
Adjusting work platform
Staging adjusting (beginning)